Overview
The Mobile Base Station - Series 2 was designed for the rapid deployment of temporary, permanent or remote sites where a Mast, Monopole and Shelter or Cabinet accommodation is required for communications equipment.
This low impact solution can be assembled on a nominally prepared site, minimising ground disturbance and providing an environmentally friendly solution.
The Base Station has been designed around three headload scenarios to cover most antenna configurations. It includes Earthing, Pole foundation, Cabinet or Equipment Building accommodation for equipment and Site Security Fencing to provide a complete compound.
Site Construction in 2 Days
Depending on the options chosen, delivery to site can be done using a standard “in gauge” truck with multiple sites on board and rigged in less than 2 days. Even our largest Base Station can be delivered without the need for Transport Pilots.
1. Sections Delivery
Deliver and unload base sections onto the prepared site, bolt outriggers in place and ensure level.
2. Bolt on Sections
Bolt on concrete wall foot sections after backfilling frame with crushed rock on top of Geotech fabric. Bolt on the concrete wall panels.
3. Install shelter
Install fence/gate panels onto purpose designed brackets. Lift shelter onto the base and bolt down.
4. Install Monopole
Install concrete monopole, earthing and rig to suit your need.