The stainless steel hut was provided for a remote Automatic Weather Station in the Coral Sea off NE Australia for the Bureau of Meteorology.
ICS designed, manufactured and delivered 19 solid concrete passive cooled solar powered CEVs and 30 ballistic rated mains powered CEVs.
ICS was involved in the design, manufacture and fit-out of a new communications hut for Thiess Rail.
ICS Industries manufactured a number of Railway Communication Buildings and Power Huts for the Victorian Regional Rail Link
Working closely with the Telstra project team, ICS developed a series of buildings that could house both active and passive equipment for a major fibre network.